Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1904.6
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Oct 02, 2023     Firewall Penetrations - (4 hours) Category: Fuselage
Called Airline Hydraulics and placed order for SMC components. I ordered soft nylon and polyurethane tubing that SMC says will work with the one touch fittings to see if I like it better than the stiff nylon tubing provided in the Stein kit.

Created a spreadsheet with a list of drawings that are related to the firewall penetrations and mounting of firewall items. Completed review and comparison of documents and made notes so I don't have to figure this out again. Some things show up on multiple documents and there are some differences between revisions that might affect me. Now I have a good understanding of which things I can install now and which things should wait until I have the engine installed and the parts ready for installation. Also I have notes about which drawings and revisions to use for each of the components or systems.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.